Freeway Transactive Xtra
About Lesson

Final Function Checks

Once the ceiling hoist is installed into the ceiling track system, you should function test the product to ensure that everything is working correctly. Follow the guidelines below to complete the function test.

1. Turn the ceiling hoist on, this is done by pressing the toggle switch red tab up into the “on” position. (See figure 12.1)
2. Operate each handset button to ensure that the ceiling hoist is responding to the correct command. See the LCD screen to confirm the command.
3. Check that the ceiling hoist can traverse correctly along the full length of the track system. Powered ceiling hoists should traverse along without any assistance.
4. Dock the ceiling hoist into the charging dock to ensure that the ceiling hoist is charging correctly.

If the ceiling hoist is not functioning as intended, refer to the troubleshooting guide for details on how to resolve the issue.