About Lesson
2.1 Required Tools and Equipment for Hoist Commissioning and Decommissioning
When carrying out work on the Ceiling Track Hoist you will require the following:
Tools Required
2mm T Bar Allen wrench
2.5mm T Bar Allen wrench
3mm T Bar Allen wrench
4mm T Bar Allen wrench
5mm T Bar Allen wrench
5.5mm combination spanner
8mm combination spanner
13mm combination spanner x2
No. 2 Pozi drive screwdriver
Small slotted screwdriver
External Circlip pliers 3-10mm
Long nose pliers
Side snips
Power Drill
Drill Piece set up to 8.5mm
Equipment Required
Step Ladder
Marker Pen
Cloth
Lint Free Cloth
The correct documentation