Some installations will require building work to be done for a successful ceiling track installation to occur. This may include electrical work such as installing spurs in suitable locations or opening up doorways for track systems to span between different rooms.  

During the assessment of the installation, which will have taken place previously, any building work that was required to take place by an approved electrician or builder, should have been completed before the day of installation, this will have been confirmed during the second assessment of the installation. The list below should only be done by an approved builder or electrician and not by an unqualified install engineer. 

– Fused (5A) Spur – This should be fitted close to the desired location of the charging dock.

– Ceiling Construction – Noggins – These must be located where track fixings are required. 

– Doorway Reconstruction – Increase doorway height to the ceiling for the track system to pass.

Wall Reconstruction – Remove the top section of a wall to allow the h-system track to pass. 

1.9.1 Electrical Installations 

See the guidance below on electrical installations, this information is for reference only, a qualified electrician must carry out all electrical installation for the ceiling track systems.

1.9.2 Doorway Reconstruction Details for Ceiling Track Systems 

See the guidance below on doorway reconstruction installations, this information is for guidance only, an approved builder must carry out all building reconstructions during a ceiling track system installation.