Course Content
Transition Gate Installation(9.0)
0/1
Testing(11.0)
0/1
Installation Knowledge Test
0/1
Ceiling Track System
About Lesson

This manual includes the fixing of all ceiling track systems into solid and hollow concrete, timber, steel works (beams), wall mountings (brick or block), and steel gantry’s fixed into a concrete or timber floor.

The ceiling track system should not be installed onto any other material without the correct authorisation.